The duplication of Reid Highway is now complete, introducing a dual carriageway between Altone Road and West Swan Road which has removed a key bottleneck reducing congestion, allowing residents to arrive home sooner and safer.
Included with the dual carriageway upgrades, the new Arthur Street Bridge is improving local connectivity for residents whilst providing better access to shops and local services on both sides of Reid Highway.
Alongside the road upgrades we have also built a 4km principal shared pathway which provides better access to the Swan Valley and growing suburbs for cyclists and pedestrians.